Lead violations in New York City come from two agencies, and owners mix them up constantly. HPD writes leadbased paint violations under the housing code. The Department of Health and Mental Hygiene issues Commissioner's Orders under the health code. Both are serious, and they run on different clocks.
The HPD side usually starts with a complaint or an inspection. Lead-based paint hazard violations from HPD are
generally Class C, immediately hazardous, with 21 days to correct, though the Notice of Violation itself always
controls the deadline, and some lead-related requirements carry their own timelines. The work rules are strict: for
any work done to correct an HPD or Health Department lead violation, only an EPA-certified lead abatement firm
can do it, no matter how small the area. A contractor with just the RRP renovation certification cannot touch
violation work. After the work, an EPA-certified firm independent of both the abatement company and the owner
takes dust wipe samples to prove the area is clean. And the obligations behind the violation continue year-round:
the annual lead notice every January, annual inspections in units where a child under six lives or spends 10 or
more hours a week, and fixing lead hazards before a new tenant moves in, including abating friction surfaces on
doors and windows at turnover.
The Health Department side starts differently. DOHMH's Healthy Homes Program inspects, often after a child is
identified with an elevated blood lead level or a doctor's referral, and it can serve the owner with a Commissioner's
Order. The order carries its own deadline, and it is short. A Commissioner's Order to Abate can direct correction
within 5 days of receipt; a Commissioner's Order to Remediate gives 21 days. The owner must hire an EPAcertified abatement firm, file a Notification of Commencement with the Healthy Homes Program before work starts, and have an independent EPA-certified inspector or risk assessor take dust samples afterward, with results delivered to the program within 5 days of finishing. Failing to comply fully can bring fines of up to $2,000 per
violation. An owner who disagrees with the findings can contest, but the notice of intent to contest has to reach
the program within 3 days of receiving the order, with supporting evidence within 5 days.
One protection runs the other way: a tenant cannot be evicted over lead paint violations. And federal law requires
owners to share what they know about lead paint with tenants and buyers.
PRACTICAL NOTES
- Read the order itself for the deadline and the scope. "5 days" and "21 days" are not interchangeable, and the clock
runs from receipt, not from when your contractor is free. - Keep the clearance dust wipe results and give a copy to the tenant after post-work cleanup. The law requires it, and
it protects you if the same condition is claimed again. - Everything lead-related gets kept for at least 10 years: notices, inspection records, testing reports, clearance results.
If you sell, those records transfer to the buyer. - If more than 100 square feet of lead paint will be disturbed, or two or more painted windows will be replaced, notify
the Health Department at least 10 days before work starts.
Facing a lead violation or a Commissioner's Order? Call ABC Environmental at (929) 581-3300.
Relevant Source: NYC DOHMH Healthy Homes Program, Landlord Instructions for Abating Lead Paint Hazards — https://www.nyc.
gov/site/doh/health/health-topics/lead-poisoning-information-for-building-owners.page